Search
2 results for “National Interconnected System (SIN)”

PROPolitics• 2h ago
Brazil Formally Schedules Annual Power Auctions Through 2029, Locking in Role for Battery Storage
The Ministry of Mines and Energy published a schedule for capacity reserve auctions through 2029, with a specific focus on integrating battery storage and pumped hydro to stabilize the grid.

Politics• Sep 09
Brazil’s ANEEL Launches R$12.9 Billion Transmission Auction, Introducing Grid-Scale Battery Storage
Brazil’s electric energy regulator opened consultation for a R$12.9 billion auction, including the first contract for battery energy storage in the National Interconnected System.